Midas GTS NX: The Future of Ontario's Transit Network


To date, the Eglinton Crosstown Transit project, a 19-kilometer light rail line, was budgeted as the most expensive infrastructure project in Canada at $8.2-billion. That is until April 10th, when Premier Doug Ford announced the

Continue Reading

Midas GTS NX: Training: Liquefaction Analysis of Bridge Abutment with UBC SAND model


Summary The response of pile foundations to lateral soil deformation induced by liquefaction during an earthquake is a key design considerat...

Midas GTS NX: Tunnel Analysis with a Structural Approach - 3D Lining


And here we reached the end of this series. So far, in the first part, we introduced some of the most relevant aspects of tunnel design, we ...

Midas GTS NX: Tunnel Excavations in 3D FEM


Summary This session focuses on numerical analysis of shallow tunnels in uneven terrains, which frequently cause soil-structure interaction ...

Midas GTS NX: Tunnel With A Structural Approach - 2D Lining


In the first part of this short series, we introduced tunneling projects with a structural approach, we also went into detail about some of ...

Midas GTS NX: Tunneling with a Structural Approach


Tunnel projects are a rather unique challenge. That's because, tunnels to put it loosely (no pun intended), are underground/buried roadways ...

Midas GTS NX: Why carry out a soil-structure interaction analysis in very soft soil?


SUMMARY The objective of the webinar is to compare the use of 3D solid soil elements vs 1D soil springs,for soil structure interaction analy...

Midas GTS NX: We'll be exhibiting at DFI 44!


MIDASoft Exhibiting at DFI’s 44th Annual Conference on Deep Foundations