go back button
Daniel Baxter
By
November 12, 2018

Do you know Arch Post-Tensioning Requirements?

 

 

 

 

 

2016 Elite Engineers Webinar Series, Daniel Baxter, Michael Baker

Purpose of the Webinar
The presentation is on the “Replacement of the Fulton Bridge". The Old Fulton Road Bridge was replaced with a PSC I-beam Superstructure over Arch spans. The superstructure was 1,574-ft-long and continuous with modular joints at the abutments.

During the presentation, the followings will be highlighted:

• Project Overview
• Arch Design – Review of the Result Forces and Stresses
• Arch Construction Sequence and Post-Tensioning
• Superstructure Design – 1,574-ft long continuous deck

 

Presentation Slides

 

pdf-download-button 

 

 

 

20180718_141851

 

 

You don't have a midas Civil license?

Don't you worry! We've got you a trial license.

Try it yourself

 

Or get a license for $600/month!

Request a Quote

 

 

 

 


 

 speaker-icon1

Speaker :  Daniel Baxter, PE, SE

Category : Bridge

Software : midas Civil

Date : 2016-03-07

 


 





Comments



Keep Updated With Technical Contents 

Keeping You Updated