Load Rating and Rehabilitation of the New River Gorge Bridge

Written by Travis Butz | Oct 24, 2018 8:45:03 PM

 

 

 

Purpose of the Webinar
Load Rating and Rehabilitation of the New River Gorge Bridge

This webinar discussed the methods used for the analysis, conducted using a three dimensional model in Midas Civil software. The model incorporated wind and temperature loading, along with nine different rating trucks. The results of the analysis were used to calculate rating factors for over 4500 members and over 1800 gusset plates and connections. The rehabilitation plans which were then in development were also discussed. These plans include steel repairs to the superstructure and substructure and bearing rehabilitation.

 

Presentation Slides

 

 

 

Featured Topics
3D Finite Element Modeling

• Temperature loading on nine different rating trucks

• Analysis and rating factors for members, gusset plates and connections


Who Attended
Structural engineers/Bridge engineers working on bridge design, load rating, and other complex bridge analysis.


Benefits of this webinar
1. Modeling methods used for a large steel arch structure
2. Use of the Midas Civil moving load analysis capabilities
3. Use of the Midas Civil linear buckling analysis capabilities
4. Extracting concurrent load cases from the model for connection analysis

All attendees received a certificate for 1 AIA approved Professional Development Hour.

 

 

 

 

 

 

Do you want to try it yourself?

Don't you worry! We've got you a trial license.

 

Or get a license for $600/month!

 

 

 


 

 

 

 

 

Speaker :  Travis Butz, PE

Category : Bridge

Software : midas Civil

Date : 2015-03-18