Study for the Compensation Grouting: The Case of the Underground Railway of Florence

P. Cucino, S. Fuoco, D. Maniezzo

SWS Engineering S.p.A., Trento, Italy

 

"Introduction

A new underground link is under construction in Florence and connects the existent FlorenceRome railway track to the new high speed railway line from Florence to Bologna. This connection will be almost totally underground in urban areas, and it has an overall length of approximately 6 km (Fig.1) with a cover thickness from 5 m to about 26 m. The new railway station is going to be located along the link track almost in the middle of the path. The settlements due to the tunnel excavation will be constantly monitored: special compensation techniques have been studied to avoid any damage to the buildings in the areas surrounding the tunnel, with particular regard to historical buildings. Nowadays the choice of the best injection technique, appropriate mixture quantity, order and number of grouting ports, is principally demanded to operators experience and know-how which results hard to transfer from one to another. The numerical study (performed by means of a 3D design software) summarized in this paper shows the effects which some key features have on compensation procedures. This study reproduced excavation advance simulating the EPB shield, surface settlement and ground reaction to compensation grouting. The results obtained from the numeric model represent a valid reference to esteem, for the simulated boundary condition, the influence of grouting on superficial subsidence field. Furthermore, the study defines an analytic procedure to design compensation grouting with regard to mixture quantity and quality, procedures and sequences to be applied for execution and defines a meaningful performance parameter to be used for design."

 

Read Now!



 

 

 

Search Keyword search-icon

      Subscribe

      Popular Tags

      midas GTS NX Tunnel MIDAS Academics Research Paper Foundation Dam Underground Excavation 3D Wall Construction Consolidation Soil Structure Interaction 2D Pile Construction Stage midas GTS numerical analysis 3D FEM Seepage Dynamic Slope Embankment Ground Rail Seismic groundwater midas Gen pressure settlements 3D modelling Alpine Base Tunnels Analysis of Finite Element Methode Bridge Combined Pile-Raft Foundations Complex Concrete Couple Analysis Coupled Analysis Culvert DDM Design Design analysis Displacement Diversion Tunnel Double shield TBMs El Nino Elastic modulus Excavating Finite Element Foundation Differential Settlements Fracod Geometry High-rise building Highly Expansive Hoek-Brown criterion Intersection Live Load Analysis Long Drought Season Long deep tunnels Monte Carlo ONKALO Parametric study Q-z curve Raft Foundations Safety Factor Shrinkage Simultaneous Blasting Soil Soil Modeling Spalling Spalling prediction Squeezing Structural Analysis Structural Design Substructure T-z curves Thermal Analysis Vertical stress Void Creation alluvial anisotropic properties axial shear stresses barrette raft base buoyancy phenomenon numerically collapse compact crystalline rock deepening elasticity embedded pile element finite element method foundation design fractured zone geological investigation geomechanical parameter geophysics ground resistance hydraulic behavior instrumentation junction limestone cavity linear-elastic ground load transfer curves load transfer mechanism mechanism non linear analysis numerical analysis of pile group numerical method numerous large pile systems o-cell loading packer permeability testing pile group pile loading portal pressuremeter testing rail tunnel seismic loading sensitivity analysis shaft shallow depths spillways standard penetration testing stress and strain subsea