Check constructability of bridge with ease,
Prevent issues and ensure safety in construction.
Midas offers various features to help in-house structural contractor.
By integrating constructability into the design, you can save time and money
from on-site-issues. You can easily generate multiple construction stage models
reflecting deck pouring and concrete material. Flexible modeling can handle
any temporary structures, scaffolding, and partial bridges during constuction.
It is fast, flexible and reliable!
|
Construction Stage Create accurate construction-staged bridges in a single model file with ease. Modeling wizards generate multiple bridge models for each phase of the construction. It is essential to consider partial structures and temporary structures with time-dependent material. Midas Civil bridge model represents the structure in different construction stages to see the actual member force/stress and the impact of various construction activities throughout the process. |
|
Flexible Modeling Flexible modeling method on midas civil help you create any temporary structures needed for the construction. You can create model using Nodes that are defined using their specific coordinates, elements are created based on nodal connectivity, and cross-sectional properties are defined on the elements to simulate section stiffness. All geometries can be represented by tabular nodal coordinates. The tabulated nodal coordinates share the dynamic link with the geometry, meaning changing in one will automatically update the other. The tabular coordinates are also compatible with MS Excel. |
|
Bridge Wizard In addition to the flexible modeling features, you can also boost modeling efficiency by using the built-in modeling wizards for all types of bridges. Suppose you need to put up a whole bridge to modify or put additional construction structures. In that case, you can also make modifications and alterations to the model generated using the wizard. |
|
Time-Dependent Material midas Civil can consider time-dependent characteristics of concrete such as creep, shrinkage, and aging for each construction stage. You can define the location of deck pouring to activate or deactivate wet concrete load. Each set can be divided into sub-steps to consider the detail stage for progress. |
|
Bridge Design Code Use updated design codes (AASHTO and CHBDC CSA) to perform bridge and temporary structure design. midas civil provides a detailed calculation process according to the codebook reference. User can quickly identify the issue and resolve. midas civil can export design report can be exported in excel format. |